redaccion de proyectos

Commissioning

We provide assistance to our clients in the start-up of installations or Commissioning and in post-occupational analyzes for the adequacy of the expected consumption of their installations, such as forecasts of industrial and tertiary energy consumption or proposal of comfort and use indicators.

Our services

""
""
During the design and execution phase of the work (commissioning):

 
  • Verification of project compliance during construction and commissioning
  • Verification that the installations installed are and tested according to the initial design.
  • Documentation of the changes made to the initial project.
  • Optimization of the facilities to the real use of the building.

 
During the operation phase:

 
  • Review of project compliance, detection of deviations and causes of malfunction of the facilities.
     

Request information by filling out our contact form, sending us an email to efficiencyenergetica@eurocontrol.es or calling 962 439 013 / 913 272 568.

Discover our other

related services

light bulb
Energy supply management

At Eurocontrol we are aware of how complicated it is to actively monitor energy costs, given the complexity of the electricity market (read this article to understand how the electricity market works). That is why we take care of managing energy supplies for companies that want to outsource it and avoid that hassle.

light bulb with all energy sources
Integral energy management
Eurocontrol provides strategic analysis and advice to help clients in all sectors, including energy-intensive industries, reduce energy consumption and costs, evaluate and deploy self-supply options, and ensure compliance with complex legislation on carbon emissions and energy consumption.
""
International performance measurement and verification protocol
Energy performance and energy efficiency are two concepts that should not be confused. They provide an accurate picture of the energy performance of buildings, housing and equipment. Measuring energy savings allows us to keep a roadmap and really measure the impact on the environment.
At a time when energy efficiency is becoming a major issue, the IPMVP is a protocol for calculating, monitoring and promoting the energy savings of a building that has benefited from energy saving measures (energy rehabilitation, etc.).

Why choose Eurocontrol ?

1

A team of experts at your disposal

more than 1,400 people specialised in different technical disciplines.
""

Geographical coverage at national level

with more than 30 branches and international presence in more than 50 countries through the Apave Group.
3

Complementary areas of activity

that allow our clients to combine safety and performance in all stages of their projects.